Building survey in Belfast
3 chartered surveyors based in Belfast, listed A–Z. A RICS-regulated surveyor, often one with experience of older or traditional buildings.
- chartered surveyors based in Belfast
- 3
- verified listings
- 2
- typical UK price, per survey, rising with the property’s value
- £700–£1,500
3 chartered surveyors based in Belfast
Listed A–Z · How we check listings
NI Building SurveysVerified
Based in Belfast · Coverage not stated, so check with the providerNI SurveysVerified
Based in Belfast · Covers Belfast, Lisburn, Armagh, Newry and across Northern IrelandAlso covering Belfast from elsewhere in Northern Ireland
These firms list Northern Ireland as an area they cover, but they are not based in Belfast. Ask whether they travel to you.
- Gold Standard Building Surveying Verified
- Holmes & Doran Verified
- Home Surveys IQ
- J.O. Dallas Associates Verified
- Keystone Building Surveying Ltd Verified
- niSurv Chartered Surveyors Verified
See all building survey firms in Northern Ireland.
Building survey in Belfast
We list 3 firms for building survey based in Belfast, in Northern Ireland. 2 of them are verified against a public register; the rest are as each firm states. All state an accreditation or membership, most often RICS (3). See how we check listings.
All of them work only in Northern Ireland. These firms most often also offer homebuyer survey (2).
The most recent listing check for these firms was on 22 October 2026.
Typical UK prices for building survey run from £700 to £1,500 (per survey, rising with the property’s value). We do not have prices for Belfast itself, so ask each firm for a quote. See the building survey cost guide.
Other reports in Belfast: heritage statement (7), domestic EPC (6), commercial EPC (6), bat survey (4), structural engineer’s report (4) and asbestos survey (4).
The rules in Northern Ireland
RICS Level 3 surveys work the same way in Northern Ireland.
Getting signed off in Northern Ireland
In Northern Ireland, your district council handles building control. New homes need a full plans application, and the council issues a completion certificate at the end. The technical rules are set out in Technical Booklets rather than Approved Documents.