Electrical safety report (EICR) in Belfast
3 electrical inspectors based in Belfast, listed A–Z. A qualified and competent electrician who inspects and tests the fixed wiring and writes the report.
Guide to electrical safety report (eicr) · All of Northern Ireland
- electrical inspectors based in Belfast
- 3
- more cover Northern Ireland
- 10
- regulation or standard
- Landlords
3 electrical inspectors based in Belfast
Listed A–Z · How we check listings
Design Electrical & Energy Services Limited (Design Electrical NI)
Based in Belfast · Covers Belfast and Northern IrelandElectrical NI
Based in Belfast · Covers BT1–BT24, including Belfast, Bangor, Holywood and BallynahinchAlso covering Belfast from elsewhere in Northern Ireland
These firms list Northern Ireland as an area they cover, but they are not based in Belfast. Ask whether they travel to you.
- AMG Electrical
- Carrick Electrix Limited
- Cooke Bros. Electrical Ltd
- CTS Electrical Services
- F&G Electrical Ltd
- JR Electrical Services Ltd
4 more firms list Northern Ireland. See all electrical safety report (EICR) firms in Northern Ireland.
Electrical safety report (EICR) in Belfast
We list 3 firms for electrical safety report (EICR) based in Belfast, in Northern Ireland. We have not verified any of them yet, so these are as each firm states. 2 of the 3 state an accreditation or membership. See how we check listings.
All of them work only in Northern Ireland.
The most recent listing check for these firms was on 22 October 2026.
We do not have a price guide for electrical safety report (EICR), so ask each firm for a quote.
Other reports in Belfast: heritage statement (7), domestic EPC (6), commercial EPC (6), bat survey (4), structural engineer’s report (4) and asbestos survey (4).
The rules in Northern Ireland
Landlords must have each rented home’s electrical installation inspected and tested by a qualified electrician at least every five years. The rules apply to new private tenancies from 1 April 2025 and to existing tenancies from 1 December 2025. Give the tenant a copy within 28 days and the council a copy within 7 days if it asks.
Getting signed off in Northern Ireland
In Northern Ireland, your district council handles building control. New homes need a full plans application, and the council issues a completion certificate at the end. The technical rules are set out in Technical Booklets rather than Approved Documents.