Building control approver
Most building work, from extensions and loft conversions to new homes and conversions, has to be checked against the Building Regulations. In England and Wales you can usually choose who does that: your council’s building control team, or a private registered building control approver. Either way, the check needs to be arranged before work starts.
This guide covers the rules in England. See Wales, Scotland and Northern Ireland.
- building control approvers listed
- 21
- verified listings
- 2
- regulation or standard
- RBCA
- region pages
- 10
21 building control approvers listed across the UK
Featured (paid) listings first, then A–Z · How we check listings
London (15) South East (14) East of England (13) South West (10) West Midlands (12) East Midlands (13) Yorkshire and the Humber (12) North West (11) North East (9) Wales (12)
National providers (3)
HCD Group
Based in Cardiff · Covers UK-wideStroma Built EnvironmentVerified
Based in Wakefield, West Yorkshire · Covers UK-wideYour two options in England and Wales
Council building control
Your local authority’s team. You apply to the council, it checks plans and inspects the work, and it issues a completion certificate at the end.
Registered building control approver
A private business registered with the Building Safety Regulator to do the same job, often called an RBCA. These used to be called approved inspectors; registration became mandatory on 6 April 2024. They give the council an initial notice saying they are handling your project and issue a final certificate at the end.
How the process usually works
- Before work starts: plans go in for checking, or with an approver, the approver notifies the council that it is handling the work
- During the build: inspections at key stages, such as foundations, drainage, structure and insulation, before work is covered up
- Reports and certificates: building control may ask for evidence such as structural calculations, SAP calculations, an air test or electrical certificates
- At the end: a completion or final certificate, which you will need when you sell the property
Choosing between them
Both must check the work against the same Building Regulations. People choose an approver for reasons such as fixed fees, one contact across several councils, or availability, and choose the council for reasons such as local knowledge. Ask each for a fee quote that says how many inspections are included and what happens if extra visits are needed. Higher-risk buildings, as defined by the Building Safety Act 2022, follow different rules: in England the Building Safety Regulator has been the building control authority for them since 1 October 2023, and in Wales new work on them must be overseen by the local authority, so a private approver cannot be used.
In Wales, Scotland and Northern Ireland
This guide describes the rules in England. Building regulations are devolved, so here is how building control approver works in the rest of the UK.
You can choose council building control or a registered building control approver in Wales too. The Building Safety Regulator keeps a separate public register for Wales, so check that an approver is on it. New work on higher-risk buildings in Wales must be overseen by the local authority.
Scotland works differently. You need a building warrant from the council before work starts, and you submit a completion certificate to the council at the end, which it accepts or rejects. Councils are appointed as verifiers by Scottish Ministers. Approved certifiers of design or construction can certify parts of the work, but they do not replace the council.
In Northern Ireland, you tell your council about the work, and its building control service inspects and approves it.
Common questions
Do I need building control for my extension?
Most extensions, loft conversions and structural alterations do. Some small works are exempt. Your council or an approver can tell you whether your project is covered.
Is building control the same as planning permission?
No. Planning permission is about whether a development is acceptable in principle and how it looks. Building control checks it is built safely and meets the Building Regulations. Many projects need both, and some need only one.
What is a registered building control approver?
A private business registered with the Building Safety Regulator to carry out building control work in England or Wales. They were previously known as approved inspectors. Registration lasts five years, and there are separate public registers for England and Wales.
Can I switch from the council to an approver part way through?
It can be possible but it is not always straightforward. It is much easier to decide before work starts, so take advice first.
What happens if I do not get a completion certificate?
You may struggle to sell or remortgage, because buyers’ solicitors normally ask for it. If work was done without building control on or after 11 November 1985, you can apply to the council for a regularisation certificate. The council may require further work before it issues one, and the certificate is evidence, but not conclusive evidence, that the work complies.
How much does building control cost?
Councils and approvers set their own fees, based on the type and size of the work. Compare quotes and check what each one includes.
Sources
The rules and dates in this guide were checked against these pages on 12 October 2026. They are independent of us and may change, so check the current version before you rely on it.
- Registered building control approvers (GOV.UK)
- Circular letter: changes to the building control process (GOV.UK)
- The Building Regulations 2010, regulation 18: unauthorised building work
- Find a building control body (Welsh Government)
- Building regulations (mygov.scot)
- Building standards: verification and certification (Scottish Government)
- How to apply for Building Regulations approval (nidirect)
New to the jargon? See our glossary of terms, from air permeability to TrustMark.