01 · Planning stage · Ecology

Bat survey in Scotland

40 providers offering bat survey in or across Scotland, including national firms. The rules in Scotland differ from England’s, so see the notes below.

At a glance
ecologists in Scotland
40
verified listing
1
typical UK price, for a preliminary roost assessment
£300–£700
regions with their own page
12
See the price guide
The rules in Scotland

Bats are also protected in Scotland, under Scottish legislation, with licences issued by NatureScot. Surveys follow the same seasonal pattern as the rest of the UK.

40 ecologists for Scotland

Featured (paid) listings first, then A–Z · How we check listings

Also offers (tick all you need)

Showing all 40 providers

Based in or covering Scotland (17)

National providers (check they cover your area) (23)

Bat survey in Scotland

This page lists ecologists covering all 32 Scottish council areas, with cities such as Glasgow, Edinburgh, Aberdeen, Dundee and Inverness. Each of the 32 councils is the planning authority for its area, under Scotland’s own planning system.

We list 17 firms for bat survey in Scotland. Of these, 9 work only in this region and 8 also cover other regions. Another 23 firms say they cover the whole UK.

Firms that work only here are based in Blantyre (1), Glasgow (1), Grantown-on-Spey (1) and Kirkhill (1).

Of the 17, 10 state an accreditation or membership, most often CIEEM Registered Practice (3) and ISO 9001 (3). We have verified 1 of the 17 listings; the rest are as each firm states. See how we check listings.

Nearby regions for bat survey: North East, North West and Northern Ireland. Other reports in Scotland: tree survey, heritage statement, biodiversity net gain assessment, drainage strategy (SuDS) and flood risk assessment. Our bat survey cost guide gives UK-wide prices; we do not have regional prices.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to bat survey →

Get bat survey quotes