01 · Planning stage · Planning

Flood risk assessment in Scotland

63 providers offering flood risk assessment in or across Scotland, including national firms. The rules in Scotland differ from England’s, so see the notes below.

At a glance
flood risk consultants in Scotland
63
verified listings
2
typical UK price, for a small site
£650–£2,500
regions with their own page
12
See the price guide
The rules in Scotland

SEPA maintains Scotland’s flood maps. Drainage strategies are assessed against Scottish planning policy and often need Scottish Water’s input.

63 flood risk consultants for Scotland

Featured (paid) listings first, then A–Z · How we check listings

Also offers (tick all you need)

Showing all 63 providers

Based in or covering Scotland (14)

National providers (check they cover your area) (49)

Flood risk assessment in Scotland

This page lists flood risk consultants covering all 32 Scottish council areas, with cities such as Glasgow, Edinburgh, Aberdeen, Dundee and Inverness. Each of the 32 councils is the planning authority for its area, under Scotland’s own planning system.

We list 14 firms for flood risk assessment in Scotland. Of these, 4 work only in this region and 10 also cover other regions. Another 49 firms say they cover the whole UK.

Firms that work only here are based in Aberdeen (1), East Kilbride (1), Edinburgh (1) and Glasgow (1).

Of the 14, 7 state an accreditation or membership, most often ISO 9001 (2). We have verified 2 of the 14 listings; the rest are as each firm states. See how we check listings.

Nearby regions for flood risk assessment: North East, North West and Northern Ireland. Other reports in Scotland: topographical survey, biodiversity net gain assessment, drainage strategy (SuDS), contaminated land report and percolation and soakaway tests. Our flood risk assessment cost guide gives UK-wide prices; we do not have regional prices.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to flood risk assessment →

Get flood risk assessment quotes