01 · Planning stage · SuDS

Drainage strategy (SuDS)

A drainage strategy sets out how rainwater and foul water from a new development will be dealt with, usually favouring sustainable drainage systems (SuDS) that slow water down and let it soak away rather than sending it straight to a sewer. Councils often ask for one with applications for new homes, and it can also come up as a planning condition.

DWGuide by Dan Wallis · Updated 12 October 2026

This guide covers the rules in England. See Wales, Scotland and Northern Ireland.

At a glance
drainage engineers listed
87
verified listings
2
regulation or standard
SuDS
region pages
12
See the drainage engineers
Who needs oneApplicants building new homes or larger extensions and hard surfaces, especially on major developments or where the council’s validation list asks for it
Who can do itA civil or drainage engineer, or a flood and drainage consultant
WhenBefore you submit the application if the council asks for it; otherwise early in design, since it affects layout

87 drainage engineers listed across the UK

Featured (paid) listings first, then A–Z · How we check listings

Drainage strategy (SuDS) by town

Gateshead (3) Glasgow (3)

National providers (44)

What a drainage strategy covers

  • Surface water: how rain from roofs, drives and paths will be managed, and at what rate it leaves the site
  • SuDS features: for example soakaways, permeable paving, rain gardens, swales or attenuation tanks
  • Foul water: how waste water will connect to a public sewer, or to a treatment plant if there is no sewer
  • Maintenance: who will look after the drainage features once the development is built. National planning policy for England expects maintenance arrangements to be in place for the lifetime of the development

When a council asks for one

  • The council’s local validation list or pre-application advice says one is needed. Planning guidance for England says that where SuDS are required, a sustainable drainage strategy should go in with the application, including outline applications
  • The scheme is a major development (for housing, 10 or more homes or a site of 0.5 hectares or more), where the council must consult the lead local flood authority on surface water drainage
  • The site is in an area with known surface water flooding or sewer capacity problems
  • A planning condition asks for drainage details to be submitted and approved before work starts

The usual order of preference

National planning policy for England asks for sustainable drainage in any development that could affect drainage on or around the site, in proportion to its scale, and planning guidance sets a hierarchy for surface water. Letting it soak into the ground comes first, then discharge to a surface water body such as a watercourse, then to a surface water sewer or highway drain, with a combined sewer as the last resort. Whether soakaways will work depends on the ground, which is why an infiltration or percolation test is often needed alongside the strategy.

In Wales, Scotland and Northern Ireland

This guide describes the rules in England. Building regulations are devolved, so here is how drainage strategy (suds) works in the rest of the UK.

Wales

In Wales, since 7 January 2019, a new development of more than one dwelling, or with a construction area of 100 m² or more, needs its surface water drainage approved by the council’s SuDS Approving Body (SAB) before work starts. SAB approval is separate from planning permission, though the two applications can be made together.

Scotland

In Scotland, surface water from a new development must go through a SuDS system under General Binding Rule 10 of the controlled activities regulations, except for a single dwelling or a discharge to coastal waters, and larger sites need a licence from SEPA. Scottish Water can adopt SuDS built to its standards and generally does not allow new surface water into combined sewers.

Northern Ireland

Councils in Northern Ireland may ask for drainage details with a planning application. New connections to the public sewer are applied for through NI Water, which decides within 21 days and needs an Article 161 agreement for sewers serving more than one property. Check your council’s requirements.

Common questions

Does my house extension need a drainage strategy?

Most householder extensions do not need a full strategy, though Building Regulations still apply to the drainage itself. Check your council’s validation list if the extension adds a large roof or hard surface, or the site floods.

Is a drainage strategy the same as a flood risk assessment?

No, though they are often done together. A flood risk assessment looks at the risk of flooding to and from the site. A drainage strategy shows how water from the development will be managed. Some councils accept both in one report.

What are SuDS?

Sustainable drainage systems: ways of managing rainwater that copy natural drainage, such as soakaways, permeable paving, ponds and green roofs, so water is slowed down and cleaned before it leaves the site.

Do I need a percolation test as well?

Often, if the strategy relies on soakaways or other infiltration. The test shows whether the ground drains well enough. Your engineer will say whether one is needed.

How much does a drainage strategy cost?

It depends on the size of the scheme, the ground conditions and how much modelling the council expects. Engineers set their own prices, so compare quotes and check what each one includes.

Who approves the drainage?

The planning authority approves the strategy as part of the application or a condition, taking advice from the lead local flood authority on major developments. Building control checks the drainage work itself. In Wales, a separate SuDS approval is also needed for most new developments.

Sources

The rules and dates in this guide were checked against these pages on 12 October 2026. They are independent of us and may change, so check the current version before you rely on it.

New to the jargon? See our glossary of terms, from air permeability to TrustMark.

Get drainage strategy (suds) quotes