02 · Building Regulations · Part L

On-construction EPC in Scotland

57 providers offering on-construction EPC in or across Scotland, including national firms. The rules in Scotland differ from England’s, so see the notes below.

At a glance
on-construction energy assessors in Scotland
57
verified listings
7
regulation or standard
Part L
regions with their own page
12
See the on-construction energy assessors
The rules in Scotland

Scotland has its own register, the Scottish EPC Register, and the EPC must be produced by a member of an approved organisation. It must also be fixed inside the new home, often in the meter cupboard. New-style Scottish EPCs are now due from 30 April 2028.

57 on-construction energy assessors for Scotland

Featured (paid) listings first, then A–Z · How we check listings

Also offers (tick all you need)

Showing all 57 providers

Based in or covering Scotland (13)

National providers (check they cover your area) (44)

On-construction EPC in Scotland

This page lists on-construction energy assessors covering all 32 Scottish council areas, with cities such as Glasgow, Edinburgh, Aberdeen, Dundee and Inverness. Scotland has its own building standards. You need a building warrant from the council before work starts and submit a completion certificate at the end.

We list 13 firms for on-construction EPC in Scotland. Of these, 7 work only in this region and 6 also cover other regions. Another 44 firms say they cover the whole UK.

Firms that work only here are based in Glasgow (3), Annbank (1), Grangemouth (1) and Larbert (1).

Of the 13, 10 state an accreditation or membership, most often SITMA (3) and ATTMA (2). We have verified 1 of the 13 listings; the rest are as each firm states. See how we check listings.

Nearby regions for on-construction EPC: North East, North West and Northern Ireland. Other reports in Scotland: SAP calculations, air tightness testing, ventilation commissioning, overheating assessment and commercial EPC. Towns in Scotland with their own on-construction EPC page: Glasgow (3).

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to on-construction EPC →

Get on-construction EPC quotes