02 · Building Regulations · Part L

On-construction EPC in Glasgow

3 on-construction energy assessors based in Glasgow, listed A–Z. An On-Construction Domestic Energy Assessor (OCDEA).

Guide to on-construction EPC · All of Scotland

At a glance
on-construction energy assessors based in Glasgow
3
more cover Scotland
10
regulation or standard
Part L
See the on-construction energy assessors

3 on-construction energy assessors based in Glasgow

Listed A–Z · How we check listings

Also covering Glasgow from elsewhere in Scotland

These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.

4 more firms list Scotland. See all on-construction EPC firms in Scotland.

On-construction EPC in Glasgow

We list 3 firms for on-construction EPC based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. 2 of the 3 state an accreditation or membership. See how we check listings.

All of them work only in Scotland. These firms most often also offer SAP calculations (3), commercial EPC (2) and domestic EPC (2).

The most recent listing check for these firms was on 10 October 2026.

We do not have a price guide for on-construction EPC, so ask each firm for a quote.

Other reports in Glasgow: domestic EPC (8), commercial EPC (5), SAP calculations (4), electrical safety report (EICR) (4), retrofit assessment (3) and contaminated land report (3).

The rules in Scotland

Scotland has its own register, the Scottish EPC Register, and the EPC must be produced by a member of an approved organisation. It must also be fixed inside the new home, often in the meter cupboard. New-style Scottish EPCs are now due from 30 April 2028.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to on-construction EPC →

Get on-construction EPC quotes