01 · Planning stage · Phase 1

Contaminated land report

A contaminated land report, usually called a Phase 1 desk study or preliminary risk assessment, checks whether past uses of a site could have left pollution in the ground that might harm future residents. Councils commonly ask for one when land has had an industrial or other potentially polluting use, or when a new home is being built, and may attach it to the planning permission as a condition.

DWGuide by Dan Wallis · Updated 12 October 2026

This guide covers the rules in England. See Wales, Scotland and Northern Ireland.

At a glance
geoenvironmental consultants listed
72
verified listings
2
regulation or standard
Phase 1
region pages
12
See the geoenvironmental consultants
Who needs oneAnyone building new homes, converting a building to homes, or developing a site with a past industrial, farm or fill-ground history
Who can do itA competent geoenvironmental consultant or contaminated land specialist
WhenBefore you submit, or to discharge a planning condition before work starts

72 geoenvironmental consultants listed across the UK

Featured (paid) listings first, then A–Z · How we check listings

Contaminated land report by town

Glasgow (3)

National providers (41)

When is a report likely to be asked for?

  • Sites with a past potentially polluting use, such as a factory, garage, petrol station, railway land, gasworks, tip or landfill nearby, or a farm with fuel stores or buried waste.
  • Sensitive end uses. Homes with gardens, flats, schools and childcare settings are treated as more sensitive than offices or warehouses, so a new home on a previously used plot is a common trigger.
  • A planning condition. Even if nothing was asked for at application stage, permission may be granted on condition that a contamination assessment is approved before work starts.
  • Your council’s local validation list. Many councils list contaminated land information as a local requirement. Check yours, or ask for pre-application advice.

What a Phase 1 desk study includes

  • Research into the site’s history using old and current maps
  • Geology, groundwater and nearby watercourses, plus records of landfill sites and pollution incidents
  • Council and Environment Agency records, and details of any earlier investigations
  • A site walkover to look for signs of contamination and check the findings on the ground
  • A conceptual site model setting out possible sources of contamination, how it could reach people or the environment, and who or what could be affected
  • Conclusions on whether further work is needed

What happens after Phase 1

If the risk looks low

No further work

The report is submitted to the council. It may be enough to satisfy a planning condition, though the council decides.

If there is a possible risk

Phase 2 site investigation

Samples are taken from soil, groundwater or ground gas on site and tested in a laboratory, to check what is actually there.

If the risk is confirmed

Remediation and verification

A remediation strategy sets out how the risk will be dealt with, and a verification report afterwards shows it was done. In England, national planning policy says that after remediation the land should, as a minimum, not be capable of being determined as contaminated land under Part 2A of the Environmental Protection Act 1990.

Timing and who does it

A desk study is much quicker than a ground investigation because no samples are taken, but timings vary, so ask each consultant how long they need. Planning the work early matters because Phase 2, if needed, takes longer and depends on site access.

The stages above follow the Environment Agency’s Land Contamination Risk Management (LCRM) guidance, where the desk study and walkover are the Stage 1 preliminary risk assessment. National planning policy for England says site assessment information should be prepared by a competent person: someone with a recognised relevant qualification, enough experience of the type of pollution involved, and membership of a relevant professional body. Responsibility for securing a safe development rests with the developer and/or landowner, not the council. Ask any consultant what experience they have of reports for your council’s planning team.

In Wales, Scotland and Northern Ireland

This guide describes the rules in England. Building regulations are devolved, so here is how contaminated land report works in the rest of the UK.

Wales

In Wales the local planning authority decides, and Natural Resources Wales advises it on risks to the water environment. NRW points developers to the same LCRM guidance, so the staged approach is the same. Check the council’s validation requirements.

Scotland

In Scotland, suspected contamination is a material consideration in planning (Planning Advice Note 33), and building standard 3.1 of the technical handbook requires harmful or dangerous substances on a site to be removed or made safe, using a desk study, site investigation and risk assessment. Check with your council’s planning and building standards teams.

Northern Ireland

In Northern Ireland, planning applications are decided by your council. Ask the council what contamination information it wants with the application; consultants generally follow the same staged approach.

Common questions

Does a house extension need a contaminated land report?

Usually not. Councils focus on previously used land and new homes. Some councils use a shorter screening form for a single new dwelling in a garden. Check your council’s validation list if you are unsure.

Is a Phase 1 desk study the same as a soil test?

No. Phase 1 is research and a site visit with no samples taken. Soil, water and gas sampling is Phase 2.

What if I bought land that turns out to be contaminated?

Contaminated land can affect your plans, finances and legal position. Speak to a specialist consultant and take legal advice about who is responsible.

How much does it cost?

Providers set their own prices, which depend on the size and history of the site, so compare quotes and ask what is included, such as the walkover and any data searches.

Can I use a report someone else already had done?

Sometimes, but councils usually want a report that is recent, relevant to your layout and proposed use, and addressed to or reliable by you. Ask the council and the original author.

How is this different from a Phase 2 report?

Phase 1 identifies what could be wrong. Phase 2 is intrusive sampling and testing to check what is actually in the ground.

Sources

The rules and dates in this guide were checked against these pages on 12 October 2026. They are independent of us and may change, so check the current version before you rely on it.