02 · Building Regulations · Part H

Percolation and soakaway tests

A percolation test measures how quickly water drains away into the ground on your site. Building control may ask for the result to show that a soakaway for rainwater, or a drainage field for a septic tank or small treatment plant, will work. The two uses are tested and judged differently, so it helps to know which one you need.

DWGuide by Dan Wallis · Updated 12 October 2026

This guide covers the rules in England. See Wales, Scotland and Northern Ireland.

At a glance
drainage and ground testing specialists listed
61
verified listings
2
regulation or standard
Part H
region pages
12
See the drainage and ground testing specialists
Who needs oneAnyone building a new home, outbuilding or extension that cannot connect rainwater or foul drainage to a public sewer
Who can do itA drainage specialist, groundworks contractor or consultant able to run and write up the test
WhenBefore the drainage is designed and before building control signs off the plans

61 drainage and ground testing specialists listed across the UK

Featured (paid) listings first, then A–Z · How we check listings

National providers (23)

Two different tests

Rainwater

Soakaway (infiltration) test

Checks whether the ground can take rainwater from roofs and hard surfaces, so a soakaway can be sized and sited. Requirement H3 of the Building Regulations (England and Wales) asks for adequate provision to carry rainwater from the roof and to drain paved areas around the building.

Foul drainage

Percolation test for a drainage field

Used where wastewater from a septic tank or small treatment plant is discharged to the ground. The result is an average percolation value (Vp), used to size the drainage field.

When is one likely to be needed?

  • New homes or extensions with no surface water sewer. Requirement H3 lists where rainwater must go, in order of priority: a soakaway or other infiltration system first, then a watercourse, then a sewer, each only where the option before it is not reasonably practicable.
  • New homes with no mains drains. A septic tank or treatment plant that discharges to the ground normally needs a percolation test to show the ground is suitable. Approved Document H says a drainage field should only be used where the average Vp is between 12 and 100.
  • Larger paved areas, new outbuildings and driveways that add enough run-off to need a proper soakaway or drainage design.
  • A planning condition asking for a drainage strategy, which may include test results.

How a test works

A tester digs trial pits at the depth where the soakaway or drainage field would sit, fills them with water, and records how quickly the level falls. The result is an infiltration rate for the ground. It is then used to work out how big the soakaway or drainage field needs to be, so tests are done before the drainage is designed.

For a drainage field, Approved Document H sets out the method: a 300 mm square hole dug to 300 mm below the proposed pipe, soaked overnight, then refilled and timed as the water drops from 75% to 25% full. That time, divided by 150, gives Vp, the average seconds for the water to fall 1 mm. The test is repeated at least three times across at least two holes and averaged. A trial hole is also dug to check that groundwater does not rise to within 1 m of the pipe.

Tests are usually done in dry weather and, for a site with different soils, in more than one place. Rock, clay or a high water table can make a site unsuitable for infiltration, in which case the designer needs a different solution, such as discharge to a watercourse or sewer.

Things to check early

  • Distances. Approved Document H says a drainage field should be at least 15 m from any building, and building control bodies expect soakaways to be kept clear of foundations too, so check the distances before you dig.
  • Whether you need other consents. In England, a septic tank or small treatment plant that discharges to the ground must either meet the Environment Agency’s general binding rules (for example, no more than 2,000 litres a day and not in a groundwater source protection zone 1) or have an environmental permit. The rules also say a new system needs building regulations approval. Building near a public sewer may need the sewerage undertaker’s agreement.
  • Whether the test result needs to be submitted with a full plans application or only made available to the building control officer on request.

In Wales, Scotland and Northern Ireland

This guide describes the rules in England. Building regulations are devolved, so here is how percolation and soakaway tests works in the rest of the UK.

Wales

Wales publishes its own version of Approved Document H. Since 7 January 2019, a new development of more than one dwelling, or with a construction area of 100 m² or more, also needs its surface water drainage approved by the council’s SuDS Approving Body (SAB) before work starts, separately from planning permission.

Scotland

In Scotland, drainage is covered by Section 3 (Environment) of the building standards technical handbook: standard 3.7 for wastewater drainage and 3.8 and 3.9 for private treatment plants, septic tanks and infiltration fields. A septic tank or package treatment plant needs authorisation from SEPA. Check with your council’s building standards team.

Northern Ireland

In Northern Ireland, drainage is covered by Technical Booklet N. A septic tank or treatment plant discharging to a waterway or to the ground needs consent from the Northern Ireland Environment Agency under the Water (Northern Ireland) Order 1999, and NIEA asks for percolation test results where discharge to the ground is proposed.

Common questions

What is a percolation test?

A field test that measures how quickly water soaks into the ground. The result shows whether a soakaway or septic tank drainage field is likely to work, and how big it needs to be.

Is a percolation test the same as a soakaway test?

They use a similar idea but are not the same. A soakaway test is for rainwater drainage. A percolation test, as the term is used for septic tanks, is for dispersing treated wastewater. Check which one your building control body or designer is asking for.

Do I need a percolation test for an extension?

Often not, if rainwater already goes to an existing sewer or soakaway that can take the extra run-off. You are more likely to need one if you have no sewer to connect to, or if the extension adds a lot of roof or paving.

What if the ground fails the test?

A failed test means water drains too slowly or too quickly for a standard design. For a drainage field, Approved Document H says values of Vp outside 12 to 100 are unlikely to treat the effluent properly. Your designer may suggest a different system, or another way of discharging water, such as to a watercourse.

How long does a test take?

The digging and testing is usually a short site visit, followed by a written result. Allow extra time for booking, for weather, and for the drainage to be designed from the result.

Who can do the test?

Drainage specialists, groundworks firms and ground investigation or environmental consultants offer it. Ask whether their report will be accepted by your building control body.

Sources

The rules and dates in this guide were checked against these pages on 12 October 2026. They are independent of us and may change, so check the current version before you rely on it.