Contaminated land report in Glasgow
3 geoenvironmental consultants based in Glasgow, listed A–Z. A competent geoenvironmental consultant or contaminated land specialist.
- geoenvironmental consultants based in Glasgow
- 3
- more cover Scotland
- 11
- regulation or standard
- Phase 1
3 geoenvironmental consultants based in Glasgow
Listed A–Z · How we check listings
Mason Evans Partnership Limited
Based in Glasgow, Lanarkshire · Covers UK-wide, with a focus on ScotlandWoolgar Hunter Ltd
Based in Glasgow, Lanarkshire · Covers Across the UK (head office Glasgow)Also covering Glasgow from elsewhere in Scotland
These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.
- Arbtech Consulting Ltd
- Create Consulting Engineers Verified
- Curtins
- Geocon Site Investigations Ltd
- Ian Farmer Associates (1998) Ltd
- Ironside Farrar Ltd
5 more firms list Scotland. See all contaminated land report firms in Scotland.
Contaminated land report in Glasgow
We list 3 firms for contaminated land report based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. None of them states an accreditation in its listing. See how we check listings.
2 work only in Scotland and 1 also covers other regions. These firms most often also offer drainage strategy (SuDS) (2) and structural engineer’s report (2).
The most recent listing check for these firms was on 17 October 2026.
We do not have a price guide for contaminated land report, so ask each firm for a quote.
Other reports in Glasgow: domestic EPC (8), commercial EPC (5), SAP calculations (4), electrical safety report (EICR) (4), on-construction EPC (3) and retrofit assessment (3).
The rules in Scotland
In Scotland, suspected contamination is a material consideration in planning (Planning Advice Note 33), and building standard 3.1 of the technical handbook requires harmful or dangerous substances on a site to be removed or made safe, using a desk study, site investigation and risk assessment. Check with your council’s planning and building standards teams.
Getting signed off in Scotland
In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.