01 · Planning stage · SuDS

Drainage strategy (SuDS) in Glasgow

3 drainage engineers based in Glasgow, listed A–Z. A civil or drainage engineer, or a flood and drainage consultant.

Guide to drainage strategy (suds) · All of Scotland

At a glance
drainage engineers based in Glasgow
3
more cover Scotland
12
regulation or standard
SuDS
See the drainage engineers

3 drainage engineers based in Glasgow

Listed A–Z · How we check listings

Also covering Glasgow from elsewhere in Scotland

These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.

6 more firms list Scotland. See all drainage strategy (SuDS) firms in Scotland.

Drainage strategy (SuDS) in Glasgow

We list 3 firms for drainage strategy (SuDS) based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. 1 of the 3 states an accreditation or membership. See how we check listings.

2 work only in Scotland and 1 also covers other regions. These firms most often also offer contaminated land report (2) and structural engineer’s report (2).

The most recent listing check for these firms was on 17 October 2026.

We do not have a price guide for drainage strategy (SuDS), so ask each firm for a quote.

Other reports in Glasgow: domestic EPC (8), commercial EPC (5), SAP calculations (4), electrical safety report (EICR) (4), on-construction EPC (3) and retrofit assessment (3).

The rules in Scotland

In Scotland, surface water from a new development must go through a SuDS system under General Binding Rule 10 of the controlled activities regulations, except for a single dwelling or a discharge to coastal waters, and larger sites need a licence from SEPA. Scottish Water can adopt SuDS built to its standards and generally does not allow new surface water into combined sewers.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to drainage strategy (suds) →

Get drainage strategy (suds) quotes