Drainage strategy (SuDS) in Glasgow
3 drainage engineers based in Glasgow, listed A–Z. A civil or drainage engineer, or a flood and drainage consultant.
- drainage engineers based in Glasgow
- 3
- more cover Scotland
- 12
- regulation or standard
- SuDS
3 drainage engineers based in Glasgow
Listed A–Z · How we check listings
Fairhurst
Based in Glasgow (offices across the UK) · Covers UK offices including Glasgow, Edinburgh, Aberdeen, Inverness, Leeds and NewcastleWoolgar Hunter Ltd
Based in Glasgow, Lanarkshire · Covers Across the UK (head office Glasgow)Also covering Glasgow from elsewhere in Scotland
These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.
- Aegaea
- Arbtech Consulting Ltd
- Arthian Ltd
- Blyth & Blyth
- Cameron + Ross Ltd
- Create Consulting Engineers Verified
6 more firms list Scotland. See all drainage strategy (SuDS) firms in Scotland.
Drainage strategy (SuDS) in Glasgow
We list 3 firms for drainage strategy (SuDS) based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. 1 of the 3 states an accreditation or membership. See how we check listings.
2 work only in Scotland and 1 also covers other regions. These firms most often also offer contaminated land report (2) and structural engineer’s report (2).
The most recent listing check for these firms was on 17 October 2026.
We do not have a price guide for drainage strategy (SuDS), so ask each firm for a quote.
Other reports in Glasgow: domestic EPC (8), commercial EPC (5), SAP calculations (4), electrical safety report (EICR) (4), on-construction EPC (3) and retrofit assessment (3).
The rules in Scotland
In Scotland, surface water from a new development must go through a SuDS system under General Binding Rule 10 of the controlled activities regulations, except for a single dwelling or a discharge to coastal waters, and larger sites need a licence from SEPA. Scottish Water can adopt SuDS built to its standards and generally does not allow new surface water into combined sewers.
Getting signed off in Scotland
In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.