03 · Existing buildings & works · Landlords

Electrical safety report (EICR) in Glasgow

4 electrical inspectors based in Glasgow, listed A–Z. A qualified and competent electrician who inspects and tests the fixed wiring and writes the report.

Guide to electrical safety report (eicr) · All of Scotland

At a glance
electrical inspectors based in Glasgow
4
more cover Scotland
9
regulation or standard
Landlords
See the electrical inspectors

4 electrical inspectors based in Glasgow

Listed A–Z · How we check listings

Also covering Glasgow from elsewhere in Scotland

These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.

3 more firms list Scotland. See all electrical safety report (EICR) firms in Scotland.

Electrical safety report (EICR) in Glasgow

We list 4 firms for electrical safety report (EICR) based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. All state an accreditation or membership, most often NICEIC Approved (2). See how we check listings.

All of them work only in Scotland.

The most recent listing check for these firms was on 22 October 2026.

We do not have a price guide for electrical safety report (EICR), so ask each firm for a quote.

Other reports in Glasgow: domestic EPC (8), commercial EPC (5), SAP calculations (4), on-construction EPC (3), retrofit assessment (3) and contaminated land report (3).

The rules in Scotland

Scotland has its own rules. The Repairing Standard covers electrical installations and appliances supplied with a rented home, and the Scottish Government publishes statutory guidance for private landlords on what inspections are expected. Check the current guidance before you let.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to electrical safety report (eicr) →

Get electrical safety report (eicr) quotes