03 · Existing buildings & works · EPC

Domestic EPC in Glasgow

8 domestic energy assessors based in Glasgow, listed A–Z. A Domestic Energy Assessor accredited with a government-approved scheme.

Guide to domestic EPC · All of Scotland

At a glance
domestic energy assessors based in Glasgow
8
verified listing
1
typical UK price, per certificate
£55–£120
See the domestic energy assessors

8 domestic energy assessors based in Glasgow

Listed A–Z · How we check listings

Also covering Glasgow from elsewhere in Scotland

These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.

20 more firms list Scotland. See all domestic EPC firms in Scotland.

Domestic EPC in Glasgow

We list 8 firms for domestic EPC based in Glasgow, in Scotland. 1 of them is verified against a public register; the rest are as each firm states. 5 of the 8 state an accreditation or membership. See how we check listings.

All of them work only in Scotland. These firms most often also offer commercial EPC (4), on-construction EPC (2) and retrofit assessment (2).

The most recent listing check for these firms was on 23 October 2026.

Typical UK prices for domestic EPC run from £55 to £120 (per certificate). We do not have prices for Glasgow itself, so ask each firm for a quote. See the domestic EPC cost guide.

Other reports in Glasgow: commercial EPC (5), SAP calculations (4), electrical safety report (EICR) (4), on-construction EPC (3), retrofit assessment (3) and contaminated land report (3). Domestic EPC in other towns in Scotland:Edinburgh (6).

The rules in Scotland

Scotland has its own register, the Scottish EPC Register. When you sell, the EPC is part of the Home Report, and it must be displayed in the home, for example in the boiler cupboard. New-style EPCs, which will last 5 years instead of 10, are due from 30/04/2028. A minimum standard for rented homes has been proposed, but its timetable is still to be confirmed.

Getting signed off in Scotland

In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.

Read the full guide to domestic EPC →

Get domestic EPC quotes