SAP calculations in Glasgow
4 SAP assessors based in Glasgow, listed A–Z. An On-Construction Domestic Energy Assessor (OCDEA) registered with an accreditation scheme.
- SAP assessors based in Glasgow
- 4
- more cover Scotland
- 16
- typical UK price, per home, design stage and as-built together
- £90–£375
4 SAP assessors based in Glasgow
Listed A–Z · How we check listings
Carbon Futures
Based in Glasgow (also Edinburgh) · Covers Throughout the UK; projects concentrated in ScotlandHulley & Kirkwood
Based in Glasgow · Coverage not stated, so check with the providerScottish Energy Services
Based in Glasgow · Covers Across Scotland; UK-wide support where service scope allowsAlso covering Glasgow from elsewhere in Scotland
These firms list Scotland as an area they cover, but they are not based in Glasgow. Ask whether they travel to you.
- AES Sustainability Consultants
- alba EPC
- DATScotland
- E2 Specialist Consultants
- Energy & Design
- EPC Direct Ltd
10 more firms list Scotland. See all SAP calculations firms in Scotland.
SAP calculations in Glasgow
We list 4 firms for SAP calculations based in Glasgow, in Scotland. We have not verified any of them yet, so these are as each firm states. 2 of the 4 state an accreditation or membership. See how we check listings.
All of them work only in Scotland. These firms most often also offer commercial EPC (3), on-construction EPC (3) and domestic EPC (2).
The most recent listing check for these firms was on 10 October 2026.
Typical UK prices for SAP calculations run from £90 to £375 (per home, design stage and as-built together). We do not have prices for Glasgow itself, so ask each firm for a quote. See the SAP calculations cost guide.
Other reports in Glasgow: domestic EPC (8), commercial EPC (5), electrical safety report (EICR) (4), on-construction EPC (3), retrofit assessment (3) and contaminated land report (3).
The rules in Scotland
New homes must meet Section 6 (Energy) of the Scottish Technical Handbook, using SAP 10.2 in software approved for Scotland. The design-stage SAP goes in with the building warrant application, and the as-built SAP with the completion certificate.
Getting signed off in Scotland
In Scotland, you need a building warrant from the council before work starts, and design evidence such as SAP and overheating assessments goes in with the application. At the end you submit a completion certificate with your test reports. The council then has 14 days to accept it, and you can’t move into a new building until it does, unless the council allows temporary occupation.